OperatePeak Demand

Pumping Setpoints

ld
lg
sb
Pre-Peak Lead On
  • %
Pre-Peak Lead On:

The pre-peak lead set point as a floating point value in the units configured for the level transducer. This is the cut-in level that will be used for the pre-peak pumping duration.

Pre-Peak Pumping duration
  • minutes
Pre-Peak Pumping duration:

The pre-peak pumping duration specifies how many minutes in advance of the peak period a new lead pump set point is to be used. The normal lead off, lag on/off, and standby on/off setpoint points are used during the pre-peak interval.

Peak Lead on
  • %
Peak Lead on:

The peak ON set point for the lead pump in the units specified by the level transducer.

Peak Lead off
  • %
Peak Lead off:

The peak OFF set point for the lead pump in the units specified by the level transducer.

Peak Lag on
  • %
Peak Lag on:

The peak ON set point for the lag pump in the units specified by the level transducer.

Peak Lag off
  • %
Peak Lag off:

The peak OFF set point for the lag pump in the units specified by the level transducer.

Peak Standby on
  • %
Peak Standby on:

The peak ON set point for the standby pump in the units specified by the level transducer.

Peak Standby off
  • %
Peak Standby off:

The peak OFF set point for the standby pump in the units specified by the level transducer.

Interval One

Peak Pumping start time
  • : : HH:MM
Peak Pumping start time:

The peak pumping start time for peak Interval 1 (HH:MM)

Peak Pumping duration
  • minutes
Peak Pumping duration:

The peak pumping duration for peak Interval 1 in minutes.

Days of operation
  • Sunday
  • Monday
  • Tuesday
  • Wednesday
  • Thursday
  • Friday
  • Saturday
Days of operation:

The days of the week that peak pumping Interval 1 will start on. Multiple days may be selected.

Interval Two

Peak Pumping start time
  • : : HH:MM
Peak Pumping start time:

The peak pumping start time for peak Interval 2 (HH:MM)

Peak Pumping duration
  • minutes
Peak Pumping duration:

The peak pumping duration for peak Interval 2 in minutes.

Days of operation
  • Sunday
  • Monday
  • Tuesday
  • Wednesday
  • Thursday
  • Friday
  • Saturday
Days of operation:

The days of the week that peak pumping Interval 2 will start on. Multiple days may be selected.